1. Investor: Hrvatske autoceste (HAC)
Project Description: Renovation of the protective wire fencing on the A4 Motorway (Zagreb – Goričan), section Breznički Hum – Kraljevečki Novaki. The project involved the installation of a protective wire fence (height: 200 cm, total length: 83 km).
2. Investor: City of Zagreb
Project Description: Implementation of an exhaust gas measurement system (CO) within the underpasses of the reconstructed Jadranska Avenue – Dubrovnik Avenue intersection.
3. Investor: Hrvatske autoceste (HAC)
Project Description: Equipping the Drava Bridge – Osijek Interchange subsection, the Halasica Bridge – Drava Bridge subsection, and the Drava Bridge on the A5 Motorway (Beli Manastir – Osijek – Svilaj), section Beli Manastir – Osijek.
Scope of work: power installations, telecommunications, traffic signaling and equipment, decorative and interior lighting, landscaping, and noise protection.
4. Investor: Hrvatske autoceste (HAC)
Project Description: Installation of new systems, traffic signaling, noise protection, and landscaping for the AC13 – DC12 (Podravina Y) route, section Vrbovec 2 – Bjelovar, subsection Vrbovec 2 – Farkaševac (Phase I). The project included telecommunication cable ducting, road lighting, 10(20)/0.4 kV substations, 2x10(20) kV cable connections for substations, traffic signals, noise barriers, landscaping, and temporary traffic regulation at the junction.